Mineral wool, rock wool furnace - silica manganese slag mineral wool furnace
Application of equipment:
The equipment is used to receive the hot melt slag from the silicon manganese ore furnace, through a small amount of tempering (mass adjustment 10%), adjust the current and voltage to make the temperature of the flow port is stable, and use the patented equipment copper gate to control the flow of slag port, and continuously transport to the centrifuge to prepare mineral wool.
Process overview:
The slag bag containing industrial waste slag is transported to the electric furnace workshop with a slag truck or rail car, poured into the furnace, began to raise the temperature and adjust the composition, and determined by temperature measurement and sampling to meet the production requirements of mineral wool, and transported to the centrifuge and subsequent mineral wool production line to provide raw materials for the mineral wool production line.
structural features:
1. Less smoke emissions and obvious environmental benefits;
2. High efficiency: the melting efficiency of electric furnace is twice that of coke cupola;
3. Electric furnace flow control is stable; Ensure the stability of the stock flow from the following aspects:
① The volume design and electrode design of electric furnace are reasonable;
② Precision design of water cooling outlet control;
③ Mobile chute with free movement.
4. Low energy consumption: the main power consumption of hot slag in electric furnace: 350-400 degrees/ton of cotton, graphite electrode consumption is 2-3kg/ ton of cotton.
5. High degree of electrical automation;
Main parameters and indicators:
1 Furnace capacity ~ 50t
2 Shell diameter Φ5200 ~ Φ5600
3 Shell height ~ 3500 mm
4 Electrode diameter Φ400mm
5 Electrode pole circle Φ1350 ~ Φ1400mm
6 Maximum electrode stroke 1800 mm
7. Transformer rated capacity 4000 KVA
Performance index:
(1) Slag production capacity: ~ 5 tons/hour (annual output of more than 30,000 tons)
(2) Slag temperature (mineral wool machine requirements) ~ 1500℃
(3) Original slag temperature ~ 1300℃ (to be measured)
(4) tons of cotton power consumption 350-500KWh/T;
3. Ton of cotton electrode consumption: 2.5-3.0Kg/t
The process flow chart of the product is as follows: